Dewatering Nile River alluvial deposits for a pumping station. Site area of about 60 meters by 60 meters, and lowered near surface water table to 14 meters below ground surface for construction of station.
Dewatering allowed a dry excavation to the designed depth.
Project inspection by: my sons Glynn and Kevin in foreground; Fred Amos - coworker and Engineer from Moretrench in middle ground; and in back-ground are self and my daughter, Kristine, in the green dress at my front.